Project PERT Estimator

Free, browser-based tool. Enter your values and get a result on this device.

One per line: ID | optimistic | most likely | pessimistic | predecessors. Example rows: Design | 2 | 3 | 5 | ; Build | 4 | 6 | 10 | Design; Review | 1 | 2 | 4 | Build. Up to 100 activities; IDs may use letters, numbers, dots, underscores and hyphens. Use the page language decimal separator; do not use thousands separators.

Use one consistent unit, such as hours, days or weeks.

This local planning model uses classic three-point PERT expected durations and CPM timing. Critical-path variance assumes independent activity durations; it is not a completion probability, calendar schedule, resource plan or delivery guarantee. Your entries stay in this browser.

Project estimate

How does this tool work?

Enter one activity per line as ID | optimistic | most likely | pessimistic | predecessor IDs. Separate multiple predecessors with commas; leave the final field blank for activities with no predecessors. Use unique IDs with letters or numbers and one consistent time unit. Enter decimals with the separator used by this page language; do not add thousands separators.

Frequently asked questions

How does this tool work?

Enter one activity per line as ID | optimistic | most likely | pessimistic | predecessor IDs. Separate multiple predecessors with commas; leave the final field blank for activities with no predecessors. Use unique IDs with letters or numbers and one consistent time unit. Enter decimals with the separator used by this page language; do not add thousands separators.

Is my input uploaded?

No. Processing runs in this browser. Your input is not uploaded or saved by this tool.

Is Project PERT Estimator free to use?

Yes. It is free in your browser and does not require an account. Device memory and browser support still apply.

How accurate is this result?

This local planning model uses classic three-point PERT expected durations and CPM timing. Critical-path variance assumes independent activity durations; it is not a completion probability, calendar schedule, resource plan or delivery guarantee. Your entries stay in this browser.