Prosjektrisiko-matrise

Gratis verktøy i nettleseren. Oppgi verdiene dine og få et resultat på denne enheten.

Prioritetsnivåene er et enkelt hjelpemiddel. Følg risikoretningslinjene til teamet ditt.

Resultat

Hvordan fungerer dette verktøyet?

Skriv én risiko per linje som navn | sannsynlighet | konsekvens. Poengsummen er de to vurderingene multiplisert med hverandre.

Veiledning

Slik bruker du Prosjektrisiko-matrise

The Project Risk Matrix scores project risks on a simple five-by-five grid. You type one risk per line with a likelihood and an impact from 1 to 5. The tool multiplies the two numbers, labels each risk Low, Medium or High and places it on the grid. It is a quick sorting aid, not a full risk method, and it does not suggest what to do about a risk.

Slik gjør du

  1. Type one risk per line in the form name | likelihood | impact, using whole numbers from 1 to 5. You can enter up to 100 lines.
  2. Press Calculate, or press Load example to see two sample risks.
  3. Read the table with each score and priority, and find the risk on the five-by-five grid. Edit the lines and press Calculate again to compare.

Eksempler

The sample risks

Du skriver inn
Rader
Late supplier | 3 | 4 Price change | 2 | 5
Du får
Sen leverandør
poengsum 12, middels
Prisendring
score 10, Medium

Likelihood times impact gives 12 and 10. Both fall between 6 and 14, so both are Medium.

Kjørt med verktøyets egen kode.

One risk in each band

Du skriver inn
Rader
Server outage | 5 | 5 Key person leaves | 3 | 2 Typo in docs | 1 | 1
Du får
Serveravbrudd
score 25, High
Nøkkelperson slutter
score 6, Medium
Skrivefeil i dokumentasjon
score 1, Low

The bands are Low for scores up to 5, Medium for 6 to 14 and High for 15 to 25. A score of exactly 6 is the first Medium and exactly 15 is the first High.

Kjørt med verktøyets egen kode.

Two different risks with the same score

Du skriver inn
Rader
Edge | 3 | 5 Edge2 | 5 | 3
Du får
Kanttilfelle
score 15, High
Kanttilfelle 2
score 15, High

A likely small problem and an unlikely large one both multiply to 15. The tool treats them the same, so look at the likelihood and impact columns too.

Kjørt med verktøyets egen kode.

Når det er nyttig

  • Sorting a first list of project risks before a planning meeting.
  • Showing a team where its risks sit on a grid.
  • Comparing the risk list before and after a change in plan.
  • Teaching how likelihood and impact combine.

Begrensninger

  • The bands are fixed at Low 1 to 5, Medium 6 to 14 and High 15 to 25. They may not match your own team's policy, which should come first.
  • Both ratings must be between 1 and 5. A decimal such as 3.9 is cut down to 3 rather than rounded, and a value above 5 or below 1 stops the calculation.
  • Each line needs a name and both numbers; a line with a missing impact gives an error. The limit is 100 risks.
  • It only multiplies two numbers. It does not weigh cost, timing, links between risks or what you can do about them.

Tips

  • Write down what 1 and 5 mean for your project before rating, so the team uses the same scale.
  • Use whole numbers only, to avoid the cut-down surprise.
  • Review the High ones first, then ask which Medium risks could move up soon.

Vanlige spørsmål

How is the score worked out?

Score is likelihood times impact, so it ranges from 1 to 25. The tool then labels it Low up to 5, Medium from 6 to 14, or High from 15 up.

What format does each line need?

A name, a vertical bar, the likelihood, another vertical bar and the impact, like Late supplier | 3 | 4. Blank lines are ignored.

Can I use decimal ratings?

Not really. Decimals are accepted but cut down to the whole number, so 3.9 counts as 3. Use whole numbers from 1 to 5 to avoid confusion.

Do I have to follow these bands?

No. They are a simple aid. If your company or client has its own risk policy, follow that one and use this tool only to sort ideas.

Does the result tell me how to handle a risk?

No. It only scores and places the risks. Choosing to avoid, reduce, share or accept a risk is a decision for you and your team.

Is my risk list uploaded?

No. The scoring happens in your browser and the tool does not upload or save your list.

Hvordan fungerer dette verktøyet?

Skriv én risiko per linje som navn | sannsynlighet | konsekvens. Poengsummen er de to vurderingene multiplisert med hverandre.

Lastes inndataene mine opp?

Nei. Behandlingen skjer i denne nettleseren. Verktøyet laster ikke opp eller lagrer inndataene dine.

Er prosjektrisiko-matrisen gratis å bruke?

Ja. Den er gratis i nettleseren og krever ingen konto. Enhetens minne og nettleserstøtte gjelder fortsatt.

Hvor nøyaktig er resultatet?

Prioritetsnivåene er et enkelt hjelpemiddel. Følg risikoretningslinjene til teamet ditt.