Lag Gantt-diagram

Skriv én oppgave per linje med startdato og varighet. Legg til nummeret på en tidligere oppgave for å vise avhengighet.

Kjøres i nettleseren. Ingen opplasting.

Your project data stays in this browser. Nothing is uploaded.

One task per line: task name | start date (YYYY-MM-DD) | duration in days | earlier task number (optional).

Your project timeline will appear here.

Om verktøyet

Lag Gantt-diagram sem complicação.

Diagrammet genereres i nettleseren. Datoer og avhengigheter kontrolleres, men planen tar ikke hensyn til helligdager, teamkapasitet eller automatisk ressursutjevning. Kontroller tidsplanen før du legger den til grunn.

Veiledning

Slik bruker du Lag Gantt-diagram

The Gantt Chart Maker turns a list of tasks into a simple project timeline. Type one task per line with a name, a start date and a length in days, and add the number of an earlier task if one must finish first. Bars are drawn on a shared date scale in your browser, with CSV export and a print view. It does not schedule anything for you.

Slik gjør du

  1. Type one task per line as name | start date | days | earlier task number, for example Design | 2026-11-05 | 4 | 1. The last part is optional, and dates use the YYYY-MM-DD form.
  2. Press Create Gantt chart, or Insert example to load a four-task sample that starts today. If a message appears, fix that line and press the button again.
  3. Use Save plan on this device to keep the text in your browser, Download CSV for a spreadsheet file, or Print chart to open a print preview.

Eksempler

A four-step plan that runs in a chain

Du skriver inn
Linjer
Research | 2026-11-02 | 3; Utforming | 2026-11-05 | 4 | 1; Bygging | 2026-11-09 | 10 | 2; Lansering | 2026-11-19 | 1 | 3
Du får
Prosjektets varighet i dager
18
Første dag
2026-11-02
Siste dag
2026-11-19
Designstolpe
Starter ved: 16.67%; Bredde: 22.22%

Each end date is the start plus the length minus one day, so Research covers 2 to 4 November. The whole chart is 18 days wide, and Design begins 3 days in, which is 3 / 18 = 16.67% of the width.

Kjørt med verktøyets egen kode.

A dependency that starts too early

Du skriver inn
Linjer
A | 2026-11-02 | 5; B | 2026-11-04 | 2 | 1
Du får
Melding
A dependent task cannot start before its earlier task finishes.

Task A runs from 2 to 6 November, but task B says it depends on A and starts on the 4th. No chart is drawn until B starts on 7 November or later.

Kjørt med verktøyets egen kode.

What one CSV row looks like

Du skriver inn
Linje
Design | 2026-11-05 | 4 | 1
Du får
Overskrift
Task,Start,Duration (days),Finish,Depends on
Rad
"Design","2026-11-05","4","2026-11-08","1"

Every value is wrapped in quotation marks, the finish date is worked out for you, and the last column holds the line number of the earlier task. Rows are separated by a carriage return and a new line.

Kjørt med verktøyets egen kode.

Når det er nyttig

  • Sketch the stages of a school, work or club project and see at a glance where they overlap.
  • Lay out a small renovation or an event-preparation schedule and print it for a wall.
  • Export the dates to a spreadsheet so a team can add owners, notes or costs.

Begrensninger

  • You can enter up to 120 tasks. Names may be up to 100 characters, a duration is a whole number from 1 to 365 days, and the whole plan must fit inside 1,095 calendar days.
  • A task can depend on one earlier line only, and it must start the day after that task ends or later. Nothing moves by itself when you edit a date, and the vertical bar cannot appear inside a name.
  • Days are plain calendar days. Weekends, holidays, team capacity and resource clashes are not considered, so check the plan yourself before relying on it. Only one plan is saved, in this browser only.

Tips

  • Write the lines in the order you want them on the chart, because a dependency number is the line position counted from 1.
  • Count the start day as day one: a 3-day task that starts on the 2nd ends on the 4th.
  • Open the CSV in a spreadsheet to add columns, but be careful with a name that starts with an equals sign, since a spreadsheet may read it as a formula.

Vanlige spørsmål

Sobre Lag Gantt-diagram.

What does the last number on each line mean?

It is the position of an earlier line, counting from 1, that must finish before this task starts. Leave it out when the task does not wait for anything. It must point upward, never to the same line or a later one.

How is the end date calculated?

The end date is the start date plus the duration minus one day, so both the first and last day count as working days of the task. A one-day task starts and ends on the same date.

Can two tasks run on the same days?

Yes. Tasks without a dependency may overlap freely and are drawn as separate bars on their own rows. Only a task with an earlier-task number is checked against that earlier task.

Does it skip weekends or holidays?

No. Every day on the calendar counts the same. If your team does not work at weekends, lengthen the duration yourself so the end date lands where you expect.

Where is my saved plan kept?

In your browser's local storage on this device, under one saved slot. Nothing is uploaded, and Delete saved plan removes it. Clearing site data or switching browsers also removes it.

Why does a name with a vertical bar fail?

The bar separates the fields on each line, so a name containing one pushes the dates out of place and the line is rejected with a date message. Use a dash or a slash in the name instead.

Hvordan bruker du Gantt-diagram?

Skriv én oppgave per linje med startdato og varighet. Legg til nummeret på en tidligere oppgave for å vise avhengighet.

Lastes dataene mine opp til en server?

Nei. Behandlingen skjer i nettleseren din, og opplysningene dine lastes ikke opp.